April 6-9, 2023: TRAX Red Line Bus Bridge

UTA is replacing 20-year-old grade crossing panels at 10200 S. This will result in a bus bridge on the TRAX Red line. Please use the following details to plan your trip:

  • Dates: April 6-9, 2023 (Thursday-Sunday)
  • Bus Bridge: 4800 W. to 5600 W. then Daybreak Station
  • Bus Bridge: Daybreak Station to 5600 W. then 4800 W.
  • Closed Station: South Jordan Parkway please use 4800 West or Daybreak Station.
  • Expected Rider Delays: 15-30 minutes
  • Regular Service Resumes: Monday, April 10th, 2023
  • More Info: www.rideuta.com/construction

OGX Ogden Central Station Construction

Utah Transit Authority is beginning construction on the OGX Ogden Central Station at the Ogden Intermodal Hub. This will result in a shift in FrontRunner pedestrian and ADA parking access, modified drop-off areas, and road and parking stall closures. Please use the map and information below to access UTA bus routes and FrontRunner trains.

Dates

  • Oct 3, 2022 - April 30, 2023
  • Schedule subject to change due to weather conditions, emergency situations, and equipment/supply issues.

Times

  • 24-hour construction noise

Service

  • FrontRunner Riders
    • No delays in service
    • Regular 30-minute peak and 60-minute off-peak service on weekdays and Saturdays
    • Parking and road access will be closed near the construction area (see map below)
    • Pedestrian access will move further south (see map below)
    • FrontRunner ADA parking will be accessible via the North driveway.
    • Rider drop-off will move east of the construction area (see map below)
  • Bus Riders
    • No delays in service
    • Regular daily bus service will continue
    • Parking and road access will be closed near the construction area (see map below)
    • Bus stop access will not change in the Ogden Intermodal Hub

Construction Map

construction map

Clearfield FrontRunner Station Construction

The Utah Transit Authority (UTA) in conjunction with Clearfield City is developing a mixed-use master development project at the Clearfield FrontRunner Station. This type of project is often referred to as a Transit-Oriented-Community or TOD. Currently, construction of the infrastructure and utilities is underway. Upon completion of critical utilities and infrastructure, development of the site will begin.

During the construction phases it will be necessary to have temporary parking, and vehicle/pedestrian access. These accesses will be adjusted from time-to-time depending on construction as warranted. It is important to follow all signage relative to parking and vehicle/pedestrian access. This is important for your safety.

Map

Provo Pedestrian Bridge Construction

UTA will begin Tiger Project work to relocate some utilities for the new Pedestrian Bridge at the Provo FrontRunner Station. These utility relocations will result in 3 ADA stalls being relocated to the south of the existing stalls (see map below).

Full construction will begin November 1, 2022 and last for approximately 10 months. Majority of the construction will be during the day, but there will be intermittent night work throughout the project. Residents and businesses should expect standard construction noise from equipment and vehicles. For any further questions about the construction please contact Provo City at (801) 852-6000.

Download the Provo Pedestrian Bridge Construction Flyer, here.

Map

200 South in Salt Lake City Long Term Detours

Due to Salt Lake City’s reconstruction of 200 South between 200 East and 900 South, Routes 2, 220 and the 205 will be on detour. These detours begin May 9, 2022 and are expected to continue through late fall of 2022.

Route 205 is using 100 South between 200 East and 500 East, in both directions.

  • All stops on 200 South between 200 East and 500 East will not be serviced, but temporary stops are available on 100 South.
200 South Construction Map 

Route 2 and Route 220 are using 100 South between 200 East and 900 East, in both directions.

  • All stops on 200 South between 200 East and 900 East will not be serviced, but temporary stops are available on 100 South.
200 South Construction Map 

For more information on this project, see https://www.slc.gov/mystreet/2020/03/27/200south/.

TRAX Substation Replacement

Utah Transit Authority is replacing 20-year old TRAX substation parts on the Red, Blue and Green Lines over the next three years. There will be no impact to riders for this construction; however, there will be minimal day and nightwork noise due to trailers, trucks, excavators, concrete mixers, cranes and cable pullers. The following section highlights the dates, locations, and details for these construction projects:

9400 South **COMPLETED**

  • Dates: 8/15/2022 - 1/23/2023
  • Location: 9735 150 E, Sandy, UT 84070
  • Details: Click Here
Collet (Midvale) Yard **COMPLETED**
  • Dates: 8/17/2022 - 1/23/2023
  • Location: 6961 S 600 W, Murray, UT 84123
  • Details: Click Here
900 East **COMPLETED**
  • Dates: 12/19/2022 - 2/10/2023
  • Location: 914 E 400 S, Salt Lake City, UT 84102
  • Details: Click Here

Sugar Highway

  • Dates: 1/23/2023 - 4/11/2023
  • Location: 189 W 7200 S, Midvale, UT 84047
  • Details: Click Here

University of Utah Rice Eccles Stadium

  • Dates: 4/12/2023 - 5/31/2023
  • Location: 1355 E 500 South, Salt Lake City, UT 84102
  • Details: Click Here

Husler

  • Dates: 6/23/2023 - 8/18/2023
  • Location: 214 West 2700 South, South Salt Lake, UT
  • Details: Click Here

200 East

  • Dates: 3/13/2023 - 4/25/2023
  • Location: 227 East 400 South, Salt Lake, UT
  • Details: Coming soon

University of Utah Medical Center

  • Dates: 3/29/2023 - 6/14/2023
  • Location: 32 Mario Capecchi Drive, Salt Lake City, UT 84112
  • Details: Click Here